Engine Assembly Line

Note the cleanliness on the interior of the plant and the workers!

Each operation performed is signed off by the worker and the records are kept for two years for quality control purposes.

I have left the resolution high on the pictures to get high quality so they may load slow. Ten links or pictures are listed below.

CRANKSHAFTS AND FLOWERS
CRANK TESTING
BARE BLOCK MACHINING
SHORT BLOCK ASSEMBLY LINE
OIL PAN INSTALLING AND SIGN OFF OF OPERATION
CYLINDER HEAD MACHINING
CYLINDER HEAD INSTALL
CLUTCH AND FLYWHEEL INSTALL
FINISHED ENGINES READY FOR TESTING
ENGINE PRESSURE TESTING

BACK TO MAHINDRA HOME PAGE